Summary
ONE of the last major projects overseen by John Hardy as Fowler And Holden's managing director was the construction of a giant Pounds 100,000 turntable for a swing bridge assembled in Sussex.
The bridge is being built over the River Ouse between Lewes and Newhaven at a total cost of Pounds 1.5 million.See the full content of this document
Extract
Swing Bridge Last Major Project
Fowler And Holden was asked to build the turnt...
See the full content of this document
Sponsored links
